HNSD / Projects

One district. Many opportunities.

Six connected elements form one district. Each has a purpose, services and conditions to validate.

Vision imagery; site, plans and dimensions are not yet validated.

HNSD / Total conceptual budget

How much would the project need?

48,000-seat stadium, 220-room hotel, shops and restaurants, 6,000 parking spaces, training centre and infrastructure.

US$1.25 billionTotal conceptual budget

This approximate estimate requires technical studies, a selected site and cost assessments before validation.

Estimate basis: the HNSD conceptual project poster.

5 million people × $250 = $1.25 billion. This is an arithmetic example, not confirmed participants or funding.

What the district budget needs to cover

The total is a conceptual planning baseline for the entire district. There is no validated cost estimate or allocation by component yet. These are the areas that need assessment.

Stadium — 48,000 seats01

Stadium — 48,000 seats

Structure, seating, pitch, roof, lighting, equipment, safety and access.

Hotel — 220 rooms02

Hotel — 220 rooms

Construction, rooms, reception, service areas, equipment and furniture.

Shops and restaurants03

Shops and restaurants

Units, shared spaces, kitchens, equipment and operator fit-outs.

Parking — 6,000 spaces04

Parking — 6,000 spaces

Site works, circulation, drainage, lighting and vehicle access.

Training centre05

Training centre

Two pitches, gym, changing rooms and sports equipment.

Land and infrastructure06

Land and infrastructure

Land acquisition, roads, water, power, drainage and utility connections.

Studies and project management

Feasibility, design, permits, supervision and quality control.

Contingency and opening preparation

Allowance for unforeseen costs, system testing and operational readiness.

How will we establish a validated budget?

Select and verify the land; conduct technical and environmental studies; prepare designs; obtain contractor quotes; then publish component costs and contingencies. Operating costs after opening require a separate plan.

HNSD / Concept & interest research

A shared vision starts with a first expression of interest.

Explore the model, share your questions and tell us what amount you would consider.